BHEGroup teamed with TVA Architects and Cameron McCarthy Gilbert & Scheibe, Landscape Architects, for development and implementation of a Master Plan for the U of O’s Track & Field facilities, including renovations in preparation of the 2008 Olympic Track and Field Trials.

BHEGroup provided civil engineering and land surveying services for this multi-phase track facility renovation project. Civil engineering services included review and recommendations for improvements to the existing facility drainage system, design of a new subsurface drainage system for the re-constructed synthetic turf infield, relocation of an existing natural gas service line and meter, and upgrade and replacement of the existing track perimeter drainage system. Design of the subsurface drainage system included compliance with City of Eugene’s new Stormwater Management requirements.